A great conical mound of heigh h is bulit by heaping uniform material found at ground level. If the total weight is M, show that the work they do is (1/4)hm.
I know that work is the integral of F(x) dx where F(x) is the force, and the volume of a cone is 1/3 pi*r squared*h...what I did was to imagine a slice of the mound of height dx, and at a height x from the ground, but I can't formulate it into an equation for the integral.
I know that work is the integral of F(x) dx where F(x) is the force, and the volume of a cone is 1/3 pi*r squared*h...what I did was to imagine a slice of the mound of height dx, and at a height x from the ground, but I can't formulate it into an equation for the integral.