A and B individually takes 12 and 27 days respectively more than what A and B together takes to do the same job. find out the number of days in which A and B together completes the job.
please explain concept and the short trick.
@a+b.....................................................................>d days
@a.........................................................................>(d+12) days
@b.........................................................................>(d+27) days
Get it? :cool:
C days is bad assigning of variable.:cool:
Only A and B are working; C is on holidays!