This is the question in the Algebra 2 book.
Crew A loads books in 6 hours.
Crew B loads books in 4 hours.
A begins.
B begins 1 hour later.
How long does it take the job to get done?
I was told this over the phone & can't get it.
Thanks for you help in advance
Crew A loads books in 6 hours.
Crew B loads books in 4 hours.
A begins.
B begins 1 hour later.
How long does it take the job to get done?
I was told this over the phone & can't get it.
Thanks for you help in advance