Hi Folks. I am teaching myself college algebra and have been trying to get this quadratic formula problem right for 4 hours without success.
Using a computer design package, Tina can write and design a direct mail package in two days less time than it takes to create the same package using traditional design methods. If Tina uses the computer and her assistant Curt uses traditional methods, and together they complete the job in 3.5 days, then how long would it have taken Curt to do the job alone using traditional methods. The answer the book gives is (9 + sqrt 53)/2 or 8.14 days
I've tried 1/x + 1/(x-2) =1/3.5 and x + x-2 = 3.5, but have not been to come up with the answer the book gives. Please tell me what I'm doing wrong.
Using a computer design package, Tina can write and design a direct mail package in two days less time than it takes to create the same package using traditional design methods. If Tina uses the computer and her assistant Curt uses traditional methods, and together they complete the job in 3.5 days, then how long would it have taken Curt to do the job alone using traditional methods. The answer the book gives is (9 + sqrt 53)/2 or 8.14 days
I've tried 1/x + 1/(x-2) =1/3.5 and x + x-2 = 3.5, but have not been to come up with the answer the book gives. Please tell me what I'm doing wrong.