I cannot figure out how to graph what I think is the second set of points for the below question. Can any help!!
A toy mfg makes two types of toy planes, jets and biplanes. Each month they make at most 120 planes. A jet takes 2 hrs to build and a biplane takes 5 hrs. They use 500 hours or less each month to build toy planes. I need to make a graph showing the number of jets and biplanes that can be made each month.
My equation is, I suppose, J + B <= 120 (so i would draw a line from point 120 to 120?
I think the second line would be 2J + 5B <= 500. I dont know how to simplify this and graph the line.
I may be wrong in my thinking all together. Any help is greatly appreciated!!!
A toy mfg makes two types of toy planes, jets and biplanes. Each month they make at most 120 planes. A jet takes 2 hrs to build and a biplane takes 5 hrs. They use 500 hours or less each month to build toy planes. I need to make a graph showing the number of jets and biplanes that can be made each month.
My equation is, I suppose, J + B <= 120 (so i would draw a line from point 120 to 120?
I think the second line would be 2J + 5B <= 500. I dont know how to simplify this and graph the line.
I may be wrong in my thinking all together. Any help is greatly appreciated!!!