I am solving a problem in production cycle. Can you please help me with the calculation of the maximal throughput of the concrete curing chamber? It has a capacity of 52 positions. Each mold has to stay there for 24 hours. principle is that when one cured mold leaves the chamber, it is replaced by newly manufactured one. What is theoretical maximum throughput of chamber per hour. The current cycle time is 20 minutes for the changeover. Thank you a lot.