I. An ice cream manufacturing company produce 2 flavored ice creams, A and B by using only one machine. To produce one liter of type A ice creams, the machine takes 3 hours and to produce 1 liter of type B ice creams the machine takes 5 hours.
a) Write a mathematical relation describing the liters of ice creams produced from each type if the machine is used 20 hours per day.
b) Due to an electrical power cut, the factory had to produce only 4 liters of type A and 2 liters of type B ice creams. How long did the machine work on that day?
c) If the Company decided to produce only type A ice creams and the total cost ? of the production is expressed as ? = 1000 + 50?, ? be the no of liters of type A. Describe the relationship between producing units and the average cost per unit.
d) Calculate the average cost per unit.
(I want the answers with steps) Thank you for helping.
a) Write a mathematical relation describing the liters of ice creams produced from each type if the machine is used 20 hours per day.
b) Due to an electrical power cut, the factory had to produce only 4 liters of type A and 2 liters of type B ice creams. How long did the machine work on that day?
c) If the Company decided to produce only type A ice creams and the total cost ? of the production is expressed as ? = 1000 + 50?, ? be the no of liters of type A. Describe the relationship between producing units and the average cost per unit.
d) Calculate the average cost per unit.
(I want the answers with steps) Thank you for helping.