The time study was conducted to determine the length of time required to perform a task in a manufacturing process. The times required by approximately two-thirds of the workers in th study satisfied the inequality
|t - 15.6/1.9| <= 1
where t is time in minutes. What are the maximum and minimum times?
Is this the right set up? And if so, is this the right order of operations and solution?
-1<= 2/3(t-15.6/1.9) <= 1
-1 <= 2/3(t - 15.6) <= 1 Cancel the 1.9 by Multiplying by its reciprocal.
-1 <= 2/3t - 31.2/3 <= 1 I get lost at this point.
|t - 15.6/1.9| <= 1
where t is time in minutes. What are the maximum and minimum times?
Is this the right set up? And if so, is this the right order of operations and solution?
-1<= 2/3(t-15.6/1.9) <= 1
-1 <= 2/3(t - 15.6) <= 1 Cancel the 1.9 by Multiplying by its reciprocal.
-1 <= 2/3t - 31.2/3 <= 1 I get lost at this point.