The limits of integration are {sqrt(y)<=x<=1, 0<=y<=1}
and the integrand is cos(x^3)
simply altering the order of integration does not simplify the problem. I have graphed the area of integration but i'm at a loss on how to reparameterize my limits of integration to simplify this problem.
I can compute once I have the new parameters.
anyone got any ideas?
and the integrand is cos(x^3)
simply altering the order of integration does not simplify the problem. I have graphed the area of integration but i'm at a loss on how to reparameterize my limits of integration to simplify this problem.
I can compute once I have the new parameters.
anyone got any ideas?